Soil drying and plant logistics

This is one of the smaller projects within Team CORE, in which we investigate the time it takes for different, polluted, soils to dry. By building an installtion to test the drying time based on the height of the soil pile. Based on these values it becomes possible to estimate the ideal logistics for a factory. Do you want to help us realize this challenge? Be sure to reach out to us using the contact form.

Partners

The Team

Thijs van Oorschot

%d bloggers like this: